Quick answer: As of November 2026, the Thompson's Station plan for growth is the town's All Aboard plan, adopted March 14, 2023. It has a land use map that guides rezonings and a road plan with 33 projects, led by widening Columbia Pike (US 31) to four lanes. Sewer capacity sets the pace for new neighborhoods. An update to both plans goes to the Board of Mayor and Aldermen on December 8, 2026.
Most people shopping in Thompson's Station look hard at the house and barely glance at the land around it. That's how a buyer gets surprised two years later, when the field behind the backyard fills in with townhomes or the road out front turns into a work zone.
The town has already written most of this down. I live in Canterbury, here in Thompson's Station, and I've been in real estate since 2013 with more than 500 transactions behind me, so reading a town's plan before an offer is part of how I work. Here's the plan in plain English, as of November 2026.
If you'd like me to look at a specific address, DM me, or text or call 615-392-1186.
What is Thompson's Station's All Aboard plan?
All Aboard is the name of the town's planning process. It produced two plans, both adopted March 14, 2023: the General Plan, which covers land use, and the Major Thoroughfare Plan, which covers roads. The plan describes Thompson's Station as the place "where the country meets the town," and in 2024 it won the Tennessee chapter of the American Planning Association's award for Outstanding Plan, Small Jurisdiction.
The General Plan's Future Land Use Map is a guide. In the plan's own words, the map "is not a regulatory document, but should be consulted when considering development approvals and amendments." Zoning decides what's legally allowed on a parcel today. The map shows what the town wants over time, and the plan says rezoning requests should "closely adhere to the spirit and intent of the placetypes."
Rezoning requests get measured against it. On March 24, 2026, the Planning Commission tabled a request to change 15.11 acres at 2053 Lewisburg Pike from Neighborhood Residential to Mixed Residential, and tabled the matching rezoning, until the land use map itself is updated. Any property owner can ask to amend the map. The Planning Commission reviews the request and sends it to the Board of Mayor and Aldermen for a vote.
How fast is Thompson's Station growing?
The plan puts the 2020 Census population at about 7,500 (the exact count was 7,485) and says the town "more than tripled" between 2010 and 2020. Its projection is "almost 20,000" people by 2040. The Census Bureau's estimate for July 1, 2025 was 9,469. I break the numbers down further in my Thompson's Station population guide.
There's room for that growth. The plan says "a majority of land is still undeveloped," and that large tracts in town sit under single ownership. The town covers about 22 square miles, with I-840 running through the middle.
What lot sizes does the Thompson's Station plan call for?
The land use map sorts every parcel into one of 11 place types. Three of them cover most of the homes you'll shop:
| Place type | What the plan describes | Lot size in the plan |
|---|---|---|
| Neighborhood Residential | One- and two-story homes | 0.67 to 1.0 acre |
| Mixed Residential | Single-family homes, plus townhomes, rowhomes and other attached homes | 0.33 to 3.0 acres for detached homes |
| Rural | A few single-family homes on large lots | More than 1 acre |
The other eight are Preservation, Neighborhood Mixed Use, Town Center, Columbia Pike Corridor, Lewisburg Pike Corridor, Burwood Gateway, Special Development Designation and Crossroads Commercial.
Lots have been shrinking for a long time. The average lot in town was 4.2 acres in 1990 and 0.6 acres in 2021, while the average home held steady at about 3,500 square feet.
The plan pushes back on some of that. It discourages "large scale, strip-center style retail" with big parking lots, calls for clustering homes so subdivisions keep more open space, and keeps a map of hilltops and ridgelines the town wants protected.
The Town Center
The plan calls the Town Center "the heart of the community," with retail, office and multifamily homes "in a central, large scale setting," zoned T4 or T5. It doesn't draw a boundary or give an acreage or a unit count. The Parks Master Plan adds a Town Center streetscape plan around the Caboose and Depot at 1550 Thompson's Station Road West, and the road plan lists a Downtown Streetscape as a high-priority project, with the cost still to be determined.
Keep the two Town Centers straight. The plan's Town Center is a place type for the middle of town. Tollgate Village has its own Town Center along Tollgate Boulevard, with shops and restaurants already open.
Which Thompson's Station road projects come first?
The Major Thoroughfare Plan recommends 33 road projects and sorts them into high, mid and low priority. It gives no year for any single project. Costs are in 2022 dollars and include engineering, right-of-way, construction, inspection and a 30% contingency. Utility relocation isn't included.
High priority in the adopted 2023 plan:
| Project | What's planned | Cost (2022 dollars) | Funding the plan expects |
|---|---|---|---|
| Columbia Pike (US 31) | Widen to 4 lanes | $25.1 million | State and federal |
| Columbia Pike North | Widen to 4 lanes | $15.8 million | State and federal |
| Lewisburg Pike (US 431) | Widen to 4 lanes | $39.6 million | State and federal |
| Critz Lane | Town 2-lane collector in the 2023 plan (the 2026 draft recommends 4 lanes, see below) | $18.0 million | Local |
| Thompson's Station Road East | Rebuild as a 2-lane collector and fix geometric problems | $18.6 million | Local |
| Fry Road | Rebuild the bridge | $0.5 million | State |
| Downtown Streetscape | Multimodal improvements | To be determined | To be determined |
TDOT's 2021 count shows why Columbia Pike tops the list: 20,189 vehicles a day north of Thompson's Station Road. The plan says that stretch carries "daily volumes that exceed the capacity of the roadway." Most of Columbia Pike runs at level of service E or F, and the plan expects most of the town's major roads to get worse by 2045 if nothing gets built.
Two projects on that list have moved since 2023, in opposite directions. TDOT accepted the town's request to move preliminary engineering on the Columbia Pike widening from 2029 to 2026, with $15 million in town funds. I cover that one in detail in my Highway 31 widening post. Lewisburg Pike, as of November 2026, "is not currently included in TDOT's 10-year plan, which means no state funds are available," according to the town. The stretch from the I-840 ramps to Critz Lane is set to be widened by the Sagefield developer instead, under an agreement the board approved October 13, 2026.
None of the 33 projects is a new interchange on I-65 or I-840.
The 2026 cost update is a draft
The draft 2026 update re-prices the same six high-priority projects and adds a price for a seventh, the Downtown Streetscape, renamed the Depot District Streetscape, at $8.5 million. These numbers aren't adopted:
| Project | 2023 plan (2022 dollars) | 2026 draft (2026 dollars) |
|---|---|---|
| Columbia Pike | $25.1 million | $67.3 million |
| Columbia Pike North | $15.8 million | $31.3 million |
| Lewisburg Pike | $39.6 million | $97.1 million |
| Critz Lane (4 lanes with roundabouts recommended) | $18.0 million | $38.9 million |
| Thompson's Station Road East | $18.6 million | $60.9 million |
| Fry Road bridge | $0.5 million | $2.18 million |
Town staff also recommend dropping one project from the draft: the Thompson's Ridge Road connector to Evergreen Road.
What's planned for Critz Lane?
I live off Critz Lane. The town's Phase 1 project on Critz went under construction December 13, 2021, with an April 2023 completion date on the town's progress report. The last right-of-way settlement passed the board on March 18, 2025, which the town administrator called "the final resolution of all issues related to the Critz Lane Project."
The adopted 2023 plan calls Critz Lane a 2-lane Town collector. The plan's standard section for that road type is a 58-foot right-of-way with two 11-foot lanes, a 5-foot sidewalk and a 10-foot multi-use path.
The draft update going to the board December 8, 2026 goes bigger. In October the Planning Commission voted to amend Critz "to a 4 lane, 5 lane collector," and staff now recommends "a 4-Lane Town Collector." The draft map key adds roundabout intersections, and the draft's cost table lists Critz at $38.9 million in 2026 dollars. That table row still reads "Town 2 Lane Collector," and no 4-lane cross-section or right-of-way width has been defined yet.
The Critz Lane Extension, a new 2-lane collector from Columbia Pike to Sedberry Road per the town's Impact Fee Study, is low priority, built as development occurs.
Approved projects already reach Critz. Fountain View must connect Kathie Drive to Critz Lane before building east of it. Critz Crossing's 8 commercial lots take access at Columbia Pike and Critz. Sagefield's site plan widens Lewisburg Pike to Critz Lane, with signal timing changes there. Briar Hill, 42 planned homes at 2762 Critz Lane, has a sewer capacity agreement only.
No construction date exists for new Critz road work.
New connector roads come with new subdivisions
Sixteen of the 33 projects are new connector roads. The plan says they're "generally the result of development and will be constructed as development occurs," paid for through development and local funds. New streets tend to arrive with new subdivisions, so if land near a home you like is mapped for a connector, the road generally comes when someone builds there.
How does sewer capacity limit new building in Thompson's Station?
Land use and zoning set what can go on a parcel. In Thompson's Station, sewer capacity decides when it can start.
The town's new regional wastewater plant at 4549 Columbia Pike was seeded on April 21, 2026, and by June 16 it was running about eight hours a day. The town's October 2026 capacity report lists current capacity at 1.5 million gallons per day, with 1,716,754 gallons per day reserved. Punch-list work was still open in the fall, and final completion hadn't been announced as of November 2026.
That 1.5 million is spoken for. In October 2025 the Utility Board noted "current requests exceed 1.5 MGD treatment capacity," and by February 2026 its minutes called that capacity "fully exhausted." On October 14, 2025, the Board of Mayor and Aldermen approved a three-phase expansion:
| Phase | Plant capacity (gallons per day) |
|---|---|
| Current rating | 1.5 million |
| Phase 1, approved October 14, 2025 | 1.85 million |
| Phase 2 | 2.6 million |
| Phase 3, the most the current site can hold | 3.35 million |
Phase 1 is paid for through a public-private partnership with the property owners who want to reserve capacity.
Capacity is handed out through a reservation process the town first adopted in 2020. The board rewrote it with Ordinance 2026-002 on March 10, 2026. Under the 2023 version, a reservation lasted one year, became a five-year allocation once approvals were in place, and could be extended up to three more years before unused capacity went back to the town. The 2026 terms may differ, so confirm them with the town's Community Development department.
Town sewer from the regional plant serves specific subdivisions, including Allenwood, Avenue Downs, Bridgemore Village, Fields of Canterbury, Tollgate Village and Whistle Stop. Littlebury has its own on-site plant that the town tracks. Land outside the regional service area may need its own on-site plant, and a separate reservation process for on-site systems went from the Utility Board's November 17, 2026 agenda to the Board of Mayor and Aldermen's December 8 agenda. For water and sewer bills, see my Thompson's Station utilities guide.
Parks and the greenway
The Parks Master Plan was adopted April 9, 2024, as a 10-year strategy. The town has more than 300 acres of parkland, including Preservation Park (about 207 acres, part of it under a conservation easement), Sarah Benson Park (about 27 acres) and Nutro Dog Park.
For Sarah Benson Park, the plan calls for a park master plan, a new inclusive playground and repaving, with an amphitheater later. It prices some of it, $300,000 for the playground and $300,000 for the amphitheater, but those are planning estimates, not funded projects. Preservation Park has a nature center on the list, estimated at $2 million.
Phase One of the greenway opened in 2014. It runs about 1.06 miles from the western edge of Tollgate Village past Nutro Dog Park to the CSX railroad undercrossing. In early 2024 the plan listed Phase Two, through Preservation Park, and Phase Three as under design. Phase Three runs from Nutro Dog Park under Columbia Pike, through Fields of Canterbury and Avenue Downs, to Thompson's Station Middle and Elementary. In February 2026 the town described it as an active construction site, with an April opening planned. I live in Canterbury, so that route runs through my own neighborhood. The plan's high-priority greenway connectors follow Columbia Pike, Thompson's Station Road and Critz Lane.
How does annexation work in Thompson's Station?
The town's limits grow one property at a time. As the town puts it, annexation under Tennessee law "only occurs at the request of the property owner." A separate Growth Plan sets the urban growth boundary, the area the town can grow into through 2040. On June 11, 2024, the Board of Mayor and Aldermen voted 5 to 0 to ratify the Williamson County Growth Plan, the first update since 2001. The owner of 12.98 acres at 4360 Columbia Pike has asked to be annexed. The Planning Commission recommended the plan of services in October 2026, and in November the board voted 3 to 1 to call a public hearing. Staff recommended holding it December 8, but the proposed December 8 agenda doesn't list it yet.
December 8, 2026: the plan update goes to the board
Both plans are being updated. The Planning Commission gave the update a favorable recommendation in October 2026, and town staff describe it as the end of a year-long review of the All Aboard process. The Board of Mayor and Aldermen is scheduled to consider it on December 8, 2026. Until that vote, the 2023 plans are the adopted ones, and every 2026 number on this page is a draft.
I'll update this post after the vote.
What this means if you're buying
Before you write an offer on a Thompson's Station home, check these for that address:
- The place type. Find the parcel on the town's land use map and zoning map, then look at the land around it. A Mixed Residential field next door can hold townhomes. A Rural one points to large lots.
- The sewer provider. Town sewer, another provider or septic changes what you're buying, and on land it decides when building can start.
- Planned roads. Look for a widening or a new connector on or near the street, especially Columbia Pike frontage and land mapped for a connector.
I run these checks on every address before my clients write an offer. For the builders and communities in town, see my Thompson's Station new construction guide, and for the town overall, my Thompson's Station guide.
Send me the address you're looking at and I'll tell you its place type, sewer provider and the planned roads near it. DM me, or text or call 615-392-1186.
Common questions about the Thompson's Station plan
What is the All Aboard plan in Thompson's Station?
All Aboard is the town's comprehensive plan. It's two documents, the General Plan and the Major Thoroughfare Plan, both adopted March 14, 2023. The General Plan has the Future Land Use Map with 11 place types, and the road plan lists 33 projects by priority. An update goes to the Board of Mayor and Aldermen on December 8, 2026.
Is the Future Land Use Map the same as zoning?
No. The plan says the map "is not a regulatory document." Zoning controls what's allowed on a parcel today. The map guides rezoning decisions, and in March 2026 the Planning Commission tabled a rezoning on Lewisburg Pike until the map itself is updated.
When will Highway 31 be widened in Thompson's Station?
As of November 2026, it's in design. TDOT moved preliminary engineering from 2029 to 2026 with $15 million in town funds. No right-of-way schedule or construction letting date has been published.
Is there sewer capacity for new homes in Thompson's Station?
The new regional plant has been running since spring 2026 at a 1.5 million gallon-a-day rating, and that capacity is reserved. A Phase 1 expansion to 1.85 million was approved in October 2025. The town allocates capacity through a reservation process, so ask Community Development about a specific parcel.
Can Thompson's Station annex my property without my request?
The town says annexation under Tennessee law only occurs at the property owner's request. The urban growth boundary shows where the town can grow through 2040, and it is not an annexation plan.
Is Critz Lane being widened?
Not yet. As of November 2026, the adopted 2023 plan shows Critz Lane as a 2-lane Town collector. The draft update going to the Board of Mayor and Aldermen on December 8, 2026 recommends a 4-lane Town collector with roundabout intersections, and its cost table lists Critz Lane at $38.9 million. No 4-lane design, right-of-way width or construction date exists yet.